{"date_updated":"2022-01-06T06:51:31Z","date_created":"2019-09-17T13:35:24Z","author":[{"last_name":"Tierney","first_name":"Kevin","full_name":"Tierney, Kevin"},{"full_name":"Ehmke, Jan Fabian","first_name":"Jan Fabian","last_name":"Ehmke"},{"last_name":"Campbell","first_name":"Ann Melissa","full_name":"Campbell, Ann Melissa"},{"first_name":"Daniel","full_name":"Müller, Daniel","last_name":"Müller"}],"type":"journal_article","_id":"13248","project":[{"_id":"52","name":"Computing Resources Provided by the Paderborn Center for Parallel Computing"}],"year":"2018","title":"Liner Shipping Single Service Design Problem with Arrival Time Service Levels","doi":"10.1007/s10696-018-9325-y","publication_status":"published","status":"public","publication_identifier":{"issn":["1936-6582","1936-6590"]},"user_id":"40778","page":"620-652","citation":{"bibtex":"@article{Tierney_Ehmke_Campbell_Müller_2018, title={Liner Shipping Single Service Design Problem with Arrival Time Service Levels}, DOI={10.1007/s10696-018-9325-y}, journal={Flexible Services and Manufacturing Journal}, author={Tierney, Kevin and Ehmke, Jan Fabian and Campbell, Ann Melissa and Müller, Daniel}, year={2018}, pages={620–652} }","mla":"Tierney, Kevin, et al. “Liner Shipping Single Service Design Problem with Arrival Time Service Levels.” Flexible Services and Manufacturing Journal, 2018, pp. 620–52, doi:10.1007/s10696-018-9325-y.","ama":"Tierney K, Ehmke JF, Campbell AM, Müller D. Liner Shipping Single Service Design Problem with Arrival Time Service Levels. Flexible Services and Manufacturing Journal. 2018:620-652. doi:10.1007/s10696-018-9325-y","ieee":"K. Tierney, J. F. Ehmke, A. M. Campbell, and D. Müller, “Liner Shipping Single Service Design Problem with Arrival Time Service Levels,” Flexible Services and Manufacturing Journal, pp. 620–652, 2018.","short":"K. Tierney, J.F. Ehmke, A.M. Campbell, D. Müller, Flexible Services and Manufacturing Journal (2018) 620–652.","chicago":"Tierney, Kevin, Jan Fabian Ehmke, Ann Melissa Campbell, and Daniel Müller. “Liner Shipping Single Service Design Problem with Arrival Time Service Levels.” Flexible Services and Manufacturing Journal, 2018, 620–52. https://doi.org/10.1007/s10696-018-9325-y.","apa":"Tierney, K., Ehmke, J. F., Campbell, A. M., & Müller, D. (2018). Liner Shipping Single Service Design Problem with Arrival Time Service Levels. Flexible Services and Manufacturing Journal, 620–652. https://doi.org/10.1007/s10696-018-9325-y"},"publication":"Flexible Services and Manufacturing Journal","language":[{"iso":"eng"}]}