{"user_id":"66459","language":[{"iso":"eng"}],"author":[{"full_name":"Wituschek, Simon","last_name":"Wituschek","first_name":"Simon"},{"id":"66459","full_name":"Kappe, Fabian","last_name":"Kappe","first_name":"Fabian"},{"full_name":"Lechner, Michael","last_name":"Lechner","first_name":"Michael"}],"department":[{"_id":"630"}],"date_created":"2022-03-03T10:08:47Z","status":"public","citation":{"chicago":"Wituschek, Simon, Fabian Kappe, and Michael Lechner. “Investigation of the Influence of Varying Tumbling Strategies on a Tumbling Self-Piercing Riveting Process.” Production Engineering, 2021. https://doi.org/10.1007/s11740-021-01099-3.","apa":"Wituschek, S., Kappe, F., & Lechner, M. (2021). Investigation of the influence of varying tumbling strategies on a tumbling self-piercing riveting process. Production Engineering. https://doi.org/10.1007/s11740-021-01099-3","bibtex":"@article{Wituschek_Kappe_Lechner_2021, title={Investigation of the influence of varying tumbling strategies on a tumbling self-piercing riveting process}, DOI={10.1007/s11740-021-01099-3}, journal={Production Engineering}, author={Wituschek, Simon and Kappe, Fabian and Lechner, Michael}, year={2021} }","short":"S. Wituschek, F. Kappe, M. Lechner, Production Engineering (2021).","mla":"Wituschek, Simon, et al. “Investigation of the Influence of Varying Tumbling Strategies on a Tumbling Self-Piercing Riveting Process.” Production Engineering, 2021, doi:10.1007/s11740-021-01099-3.","ieee":"S. Wituschek, F. Kappe, and M. Lechner, “Investigation of the influence of varying tumbling strategies on a tumbling self-piercing riveting process,” Production Engineering, 2021, doi: 10.1007/s11740-021-01099-3.","ama":"Wituschek S, Kappe F, Lechner M. Investigation of the influence of varying tumbling strategies on a tumbling self-piercing riveting process. Production Engineering. Published online 2021. doi:10.1007/s11740-021-01099-3"},"type":"journal_article","title":"Investigation of the influence of varying tumbling strategies on a tumbling self-piercing riveting process","year":"2021","quality_controlled":"1","_id":"30200","publication":"Production Engineering","doi":"10.1007/s11740-021-01099-3","date_updated":"2023-04-27T08:54:09Z","project":[{"grant_number":"418701707","name":"TRR 285: TRR 285","_id":"130"},{"_id":"133","name":"TRR 285 - C: TRR 285 - Project Area C"},{"_id":"146","name":"TRR 285 – C02: TRR 285 - Subproject C02"}]}