[{"date_created":"2024-05-04T15:27:53Z","department":[{"_id":"277"}],"type":"journal_article","citation":{"mla":"Tavana, Madjid, et al. “A New Dynamic Two-Stage Mathematical Programming Model under Uncertainty for Project Evaluation and Selection.” <i>Computers &#38; Industrial Engineering</i>, vol. 149, 106795, Elsevier BV, 2020, doi:<a href=\"https://doi.org/10.1016/j.cie.2020.106795\">10.1016/j.cie.2020.106795</a>.","bibtex":"@article{Tavana_Khosrojerdi_Mina_Rahman_2020, title={A new dynamic two-stage mathematical programming model under uncertainty for project evaluation and selection}, volume={149}, DOI={<a href=\"https://doi.org/10.1016/j.cie.2020.106795\">10.1016/j.cie.2020.106795</a>}, number={106795}, journal={Computers &#38; Industrial Engineering}, publisher={Elsevier BV}, author={Tavana, Madjid and Khosrojerdi, Ghasem and Mina, Hassan and Rahman, Amirah}, year={2020} }","ama":"Tavana M, Khosrojerdi G, Mina H, Rahman A. A new dynamic two-stage mathematical programming model under uncertainty for project evaluation and selection. <i>Computers &#38; Industrial Engineering</i>. 2020;149. doi:<a href=\"https://doi.org/10.1016/j.cie.2020.106795\">10.1016/j.cie.2020.106795</a>","ieee":"M. Tavana, G. Khosrojerdi, H. Mina, and A. Rahman, “A new dynamic two-stage mathematical programming model under uncertainty for project evaluation and selection,” <i>Computers &#38; Industrial Engineering</i>, vol. 149, Art. no. 106795, 2020, doi: <a href=\"https://doi.org/10.1016/j.cie.2020.106795\">10.1016/j.cie.2020.106795</a>.","apa":"Tavana, M., Khosrojerdi, G., Mina, H., &#38; Rahman, A. (2020). A new dynamic two-stage mathematical programming model under uncertainty for project evaluation and selection. <i>Computers &#38; Industrial Engineering</i>, <i>149</i>, Article 106795. <a href=\"https://doi.org/10.1016/j.cie.2020.106795\">https://doi.org/10.1016/j.cie.2020.106795</a>","short":"M. Tavana, G. Khosrojerdi, H. Mina, A. Rahman, Computers &#38; Industrial Engineering 149 (2020).","chicago":"Tavana, Madjid, Ghasem Khosrojerdi, Hassan Mina, and Amirah Rahman. “A New Dynamic Two-Stage Mathematical Programming Model under Uncertainty for Project Evaluation and Selection.” <i>Computers &#38; Industrial Engineering</i> 149 (2020). <a href=\"https://doi.org/10.1016/j.cie.2020.106795\">https://doi.org/10.1016/j.cie.2020.106795</a>."},"publication":"Computers & Industrial Engineering","language":[{"iso":"eng"}],"_id":"53886","publisher":"Elsevier BV","article_number":"106795","volume":149,"user_id":"51811","doi":"10.1016/j.cie.2020.106795","author":[{"first_name":"Madjid","last_name":"Tavana","full_name":"Tavana, Madjid","id":"31858"},{"full_name":"Khosrojerdi, Ghasem","first_name":"Ghasem","last_name":"Khosrojerdi"},{"first_name":"Hassan","last_name":"Mina","full_name":"Mina, Hassan"},{"full_name":"Rahman, Amirah","first_name":"Amirah","last_name":"Rahman"}],"publication_identifier":{"issn":["0360-8352"]},"status":"public","title":"A new dynamic two-stage mathematical programming model under uncertainty for project evaluation and selection","year":"2020","intvolume":"       149","publication_status":"published","date_updated":"2024-05-04T15:57:40Z"}]
