A parameter tuned hybrid algorithm for solving flow shop scheduling problems with parallel assembly stages

M. Jabbari, M. Tavana, P. Fattahi, F. Daneshamooz, Sustainable Operations and Computers 3 (2022) 22–32.

Download
Es wurde kein Volltext hochgeladen.
Zeitschriftenaufsatz | Veröffentlicht | Englisch
Autor*in
Jabbari, Mona; Tavana, MadjidLibreCat; Fattahi, Parviz; Daneshamooz, Fatemeh
Erscheinungsjahr
Zeitschriftentitel
Sustainable Operations and Computers
Band
3
Seite
22-32
ISSN
LibreCat-ID

Zitieren

Jabbari M, Tavana M, Fattahi P, Daneshamooz F. A parameter tuned hybrid algorithm for solving flow shop scheduling problems with parallel assembly stages. Sustainable Operations and Computers. 2022;3:22-32. doi:10.1016/j.susoc.2021.09.002
Jabbari, M., Tavana, M., Fattahi, P., & Daneshamooz, F. (2022). A parameter tuned hybrid algorithm for solving flow shop scheduling problems with parallel assembly stages. Sustainable Operations and Computers, 3, 22–32. https://doi.org/10.1016/j.susoc.2021.09.002
@article{Jabbari_Tavana_Fattahi_Daneshamooz_2022, title={A parameter tuned hybrid algorithm for solving flow shop scheduling problems with parallel assembly stages}, volume={3}, DOI={10.1016/j.susoc.2021.09.002}, journal={Sustainable Operations and Computers}, publisher={Elsevier BV}, author={Jabbari, Mona and Tavana, Madjid and Fattahi, Parviz and Daneshamooz, Fatemeh}, year={2022}, pages={22–32} }
Jabbari, Mona, Madjid Tavana, Parviz Fattahi, and Fatemeh Daneshamooz. “A Parameter Tuned Hybrid Algorithm for Solving Flow Shop Scheduling Problems with Parallel Assembly Stages.” Sustainable Operations and Computers 3 (2022): 22–32. https://doi.org/10.1016/j.susoc.2021.09.002.
M. Jabbari, M. Tavana, P. Fattahi, and F. Daneshamooz, “A parameter tuned hybrid algorithm for solving flow shop scheduling problems with parallel assembly stages,” Sustainable Operations and Computers, vol. 3, pp. 22–32, 2022, doi: 10.1016/j.susoc.2021.09.002.
Jabbari, Mona, et al. “A Parameter Tuned Hybrid Algorithm for Solving Flow Shop Scheduling Problems with Parallel Assembly Stages.” Sustainable Operations and Computers, vol. 3, Elsevier BV, 2022, pp. 22–32, doi:10.1016/j.susoc.2021.09.002.

Export

Markierte Publikationen

Open Data LibreCat

Suchen in

Google Scholar