Application of the NSGA-II algorithm to a multi-period inventory-redundancy allocation problem in a series-parallel system
N. Alikar, S.M. Mousavi, R.A. Raja Ghazilla, M. Tavana, E.U. Olugu, Reliability Engineering & System Safety 160 (2017) 1–10.
Download
No fulltext has been uploaded.
Journal Article
| Published
| English
Author
Alikar, Najmeh;
Mousavi, Seyed Mohsen;
Raja Ghazilla, Raja Ariffin;
Tavana, MadjidLibreCat;
Olugu, Ezutah Udoncy
Publishing Year
Journal Title
Reliability Engineering & System Safety
Volume
160
Page
1-10
ISSN
LibreCat-ID
Cite this
Alikar N, Mousavi SM, Raja Ghazilla RA, Tavana M, Olugu EU. Application of the NSGA-II algorithm to a multi-period inventory-redundancy allocation problem in a series-parallel system. Reliability Engineering & System Safety. 2017;160:1-10. doi:10.1016/j.ress.2016.10.023
Alikar, N., Mousavi, S. M., Raja Ghazilla, R. A., Tavana, M., & Olugu, E. U. (2017). Application of the NSGA-II algorithm to a multi-period inventory-redundancy allocation problem in a series-parallel system. Reliability Engineering & System Safety, 160, 1–10. https://doi.org/10.1016/j.ress.2016.10.023
@article{Alikar_Mousavi_Raja Ghazilla_Tavana_Olugu_2017, title={Application of the NSGA-II algorithm to a multi-period inventory-redundancy allocation problem in a series-parallel system}, volume={160}, DOI={10.1016/j.ress.2016.10.023}, journal={Reliability Engineering & System Safety}, publisher={Elsevier BV}, author={Alikar, Najmeh and Mousavi, Seyed Mohsen and Raja Ghazilla, Raja Ariffin and Tavana, Madjid and Olugu, Ezutah Udoncy}, year={2017}, pages={1–10} }
Alikar, Najmeh, Seyed Mohsen Mousavi, Raja Ariffin Raja Ghazilla, Madjid Tavana, and Ezutah Udoncy Olugu. “Application of the NSGA-II Algorithm to a Multi-Period Inventory-Redundancy Allocation Problem in a Series-Parallel System.” Reliability Engineering & System Safety 160 (2017): 1–10. https://doi.org/10.1016/j.ress.2016.10.023.
N. Alikar, S. M. Mousavi, R. A. Raja Ghazilla, M. Tavana, and E. U. Olugu, “Application of the NSGA-II algorithm to a multi-period inventory-redundancy allocation problem in a series-parallel system,” Reliability Engineering & System Safety, vol. 160, pp. 1–10, 2017, doi: 10.1016/j.ress.2016.10.023.
Alikar, Najmeh, et al. “Application of the NSGA-II Algorithm to a Multi-Period Inventory-Redundancy Allocation Problem in a Series-Parallel System.” Reliability Engineering & System Safety, vol. 160, Elsevier BV, 2017, pp. 1–10, doi:10.1016/j.ress.2016.10.023.