On the Pitfalls of UML Activity Modeling
T. Schattkowsky, A. Förster, in: Proceedings of the ICSE Workshop on Modeling in Software Engineering (MISE 2007), Minneapolis, MN (USA), IEEE Computer Society, Los Alamitos, CA, USA, 2007, p. 8.
Download
No fulltext has been uploaded.
Conference Paper
| English
Author
Schattkowsky, Tim;
Förster, Alexander
Department
Abstract
With the introduction of new Petri net-like semantics for Activities in UML 2.0, these have become a complete language for modeling behavior. Thus, UML Activities are nowadays investigated for application in many areas from embedded systems to business process modeling. However, some issues have been discovered that currently seem to limit the practical applicability of Activities. In this paper, we present an overview of the identified semantic and syntactic problems, and point at possible solutions and directions for future research.
Publishing Year
Proceedings Title
Proceedings of the ICSE workshop on Modeling in Software Engineering (MISE 2007), Minneapolis, MN (USA)
Page
8
LibreCat-ID
Cite this
Schattkowsky T, Förster A. On the Pitfalls of UML Activity Modeling. In: Proceedings of the ICSE Workshop on Modeling in Software Engineering (MISE 2007), Minneapolis, MN (USA). Los Alamitos, CA, USA: IEEE Computer Society; 2007:8. doi:http://dx.doi.org/10.1109/MISE.2007.12
Schattkowsky, T., & Förster, A. (2007). On the Pitfalls of UML Activity Modeling. In Proceedings of the ICSE workshop on Modeling in Software Engineering (MISE 2007), Minneapolis, MN (USA) (p. 8). Los Alamitos, CA, USA: IEEE Computer Society. http://dx.doi.org/10.1109/MISE.2007.12
@inproceedings{Schattkowsky_Förster_2007, place={Los Alamitos, CA, USA}, title={On the Pitfalls of UML Activity Modeling}, DOI={http://dx.doi.org/10.1109/MISE.2007.12}, booktitle={Proceedings of the ICSE workshop on Modeling in Software Engineering (MISE 2007), Minneapolis, MN (USA)}, publisher={IEEE Computer Society}, author={Schattkowsky, Tim and Förster, Alexander}, year={2007}, pages={8} }
Schattkowsky, Tim, and Alexander Förster. “On the Pitfalls of UML Activity Modeling.” In Proceedings of the ICSE Workshop on Modeling in Software Engineering (MISE 2007), Minneapolis, MN (USA), 8. Los Alamitos, CA, USA: IEEE Computer Society, 2007. http://dx.doi.org/10.1109/MISE.2007.12.
T. Schattkowsky and A. Förster, “On the Pitfalls of UML Activity Modeling,” in Proceedings of the ICSE workshop on Modeling in Software Engineering (MISE 2007), Minneapolis, MN (USA), 2007, p. 8.
Schattkowsky, Tim, and Alexander Förster. “On the Pitfalls of UML Activity Modeling.” Proceedings of the ICSE Workshop on Modeling in Software Engineering (MISE 2007), Minneapolis, MN (USA), IEEE Computer Society, 2007, p. 8, doi:http://dx.doi.org/10.1109/MISE.2007.12.