Timing Modeling and Analysis for AUTOSAR-Based Software Development - A Case Study

K. Klobedanz, C. Kuznik, A. Thuy, W. Müller, in: Proceedings of DATE’10, Dresden, IEEE, Dresden, 2010.

Download
No fulltext has been uploaded.
Conference Paper | English
Author
Klobedanz, Kay; Kuznik, Christoph; Thuy, Andre; Müller, WolfgangLibreCat
Abstract
Safety-critical automotive systems must fulfill hard real-time constraints for reliability and safety. This paper presents a case study for the application of an AUTOSAR-based language for timing modeling and analysis. We present and apply the Timing Augmented Description Language (TADL) and demonstrate a methodology for the development of a speed-adaptive steer-by-wire system. We examine the impact of TADL and the methodology on the development process and the suitability and interoperability of the applied tools with respect to the AUTOSAR-based tool chain in the context of our case study.
Publishing Year
Proceedings Title
Proceedings of DATE’10, Dresden
Conference
2010 Design, Automation & Test in Europe Conference & Exhibition (DATE 2010)
Conference Location
Dresden
LibreCat-ID

Cite this

Klobedanz K, Kuznik C, Thuy A, Müller W. Timing Modeling and Analysis for AUTOSAR-Based Software Development - A Case Study. In: Proceedings of DATE’10, Dresden. IEEE; 2010. doi:10.1109/DATE.2010.5457125
Klobedanz, K., Kuznik, C., Thuy, A., & Müller, W. (2010). Timing Modeling and Analysis for AUTOSAR-Based Software Development - A Case Study. Proceedings of DATE’10, Dresden. 2010 Design, Automation & Test in Europe Conference & Exhibition (DATE 2010), Dresden. https://doi.org/10.1109/DATE.2010.5457125
@inproceedings{Klobedanz_Kuznik_Thuy_Müller_2010, place={Dresden}, title={Timing Modeling and Analysis for AUTOSAR-Based Software Development - A Case Study}, DOI={10.1109/DATE.2010.5457125}, booktitle={Proceedings of DATE’10, Dresden}, publisher={IEEE}, author={Klobedanz, Kay and Kuznik, Christoph and Thuy, Andre and Müller, Wolfgang}, year={2010} }
Klobedanz, Kay, Christoph Kuznik, Andre Thuy, and Wolfgang Müller. “Timing Modeling and Analysis for AUTOSAR-Based Software Development - A Case Study.” In Proceedings of DATE’10, Dresden. Dresden: IEEE, 2010. https://doi.org/10.1109/DATE.2010.5457125.
K. Klobedanz, C. Kuznik, A. Thuy, and W. Müller, “Timing Modeling and Analysis for AUTOSAR-Based Software Development - A Case Study,” presented at the 2010 Design, Automation & Test in Europe Conference & Exhibition (DATE 2010), Dresden, 2010, doi: 10.1109/DATE.2010.5457125.
Klobedanz, Kay, et al. “Timing Modeling and Analysis for AUTOSAR-Based Software Development - A Case Study.” Proceedings of DATE’10, Dresden, IEEE, 2010, doi:10.1109/DATE.2010.5457125.

Export

Marked Publications

Open Data LibreCat

Search this title in

Google Scholar